EPC Ratings in Malvern Hills: How Many Homes Are Below Band C Before the 2030 Rule
Of the 1,482 homes in Malvern Hills that had an EPC lodged from July 2025 to June 2026, 57% were rated D to G — the bands a privately rented home must leave by 1 October 2030. The West Midlands figure is 44%; England and Wales 40%.
EPC bands in Malvern Hills, July 2025 to June 2026
| Rating | Certificates | Share |
|---|---|---|
| Band A | 10 | 0.7% |
| Band B | 61 | 4.1% |
| Band C | 571 | 39% |
| Band D | 530 | 36% |
| Band E | 234 | 16% |
| Band F | 61 | 4.1% |
| Band G | 15 | 1.0% |
57% below C (bands D to G) against 44% in the West Midlands and 40% across England and Wales. Malvern Hills ranks 9 of 318 local authorities for the share below C (1 = highest share). Since 2008, 32,960 EPCs have been lodged for existing homes in Malvern Hills and 71% of them were below C — recent certificates run better than the long-run stock because newer and improved homes transact more.
The deeper problem here is the bottom of the scale. 21% of recent certificates in Malvern Hills were E, F or G — against 6.6% in the West Midlands. F and G have been unlettable since the 2018–2020 minimum-E rules unless an exemption is registered, and an E-rated home has two bands to climb, not one; check the register before any new tenancy and budget for the cap being reached.
Is Malvern Hills moving towards C?
The direction of travel in Malvern Hills is good. Between July 2024 to June 2025 and July 2025 to June 2026 the share of certificates below C fell from 60% to 57% — a drop of 3.4 percentage points, the 141st largest fall among the 318 areas with a year-on-year figure (England and Wales overall: −2.5 points).
The homes certified here are larger than typical — an average of 113.3 m² against 87.1 m² across England and Wales — and insulation, glazing and heating measures scale with floor area, so a D-to-C job here tends to sit at the upper end of any national cost guide.
What the 2030 rule costs in Malvern Hills
Privately rented homes need band C from 1 October 2030, with a £10,000 cap on what a landlord must spend before an exemption can be registered; the rules, exemptions and what counts towards the cap are on the EPC C for rentals by 2030 guide.
Put the £10,000 cap in local terms: average private rent in Malvern Hills is £943 a month (ONS, July 2026), so the cap is roughly 10.6 months of rent — and every month a property stands empty for works costs another £943 on top of the bill. The area’s rents, prices and yields are on Malvern Hills: rents, house prices and yield.
Council tax keeps running while a home is empty for works — Band D in Malvern Hills is £2,451 for 2026/27, and the council adds a 100% premium once a home has stood empty for two years (council tax in Malvern Hills). Whether the certificate and the works are deductible is on EPC, gas and electrical certificates: deductible? — revenue repairs come off the year’s rent, improvements that add capital value do not (allowable expenses guide).
Nearest neighbours in the ranking, in the West Midlands
| Area | Below C | Year-on-year (pts) |
|---|---|---|
| Staffordshire Moorlands | 57% | −6.2 |
| Wyre Forest | 55% | +4.8 |
| North Warwickshire | 54% | +3.9 |
| Herefordshire | 51% | −2.9 |
| Walsall | 50% | −0.2 |
| Stratford-on-Avon | 49% | −2.6 |
All 318 areas ranked · council tax in Malvern Hills 2026/27 · rent, prices and yield in Malvern Hills.
MHCLG, Live tables on Energy Performance of Buildings Certificates, table EB1 — domestic EPCs lodged for existing dwellings by energy-efficiency band, published 30 July 2026, latest four quarters (July 2025 to June 2026) summed per local authority; cumulative figures from 2008. Contains public sector information licensed under the Open Government Licence v3.0. An EPC is lodged when a home is sold, let or newly built, so these are certificates issued, not a census of the housing stock. Shares, ranks and regional figures are ours, computed across 318 local authorities. Download: CSV.
Asked about EPCs here
Of EPCs lodged for existing homes from July 2025 to June 2026, 43% were band C or better and 57% were D to G; band D alone was 36%. (MHCLG live table EB1.)
The share below C moved from 60% (July 2024 to June 2025) to 57% (July 2025 to June 2026): −3.4 percentage points, against −2.5 across England and Wales.
From 1 October 2030 under the government's EPC consultation response, with a £10,000 spending cap before an exemption. Until then the minimum for a new letting is band E.
57% below C against 44% in the West Midlands — a larger share needing work.
No — only homes with an EPC lodged in the period (sold, let or built). Since 2008 the cumulative share below C is 71%, higher because older certificates and unimproved homes sit in that total.